91蝌蚪欧美视频在线-午夜精品第一区偷拍盗摄-国产三级韩国三级日本带黄-免费成人激情在线视频

Tel 400-9988-900

Pure Steam Generator


    ? Pure steam is ready at shortest reaction time of less than 30 seconds from standby. TRUKING’s unique design ensures high quality Pure steam with efficient utility consumptions.

    ? State of art pressure and temperature control with deviation range of ±5%. Efficient waste discharge at 2-8%.

    ? Variable pressure online adjustment for Pure steam 2-5 bar, excellent design to meet dynamic peak load and faster reaction time.

    ? Industrial PC control with state of art features for Audit trail, data integrity, Graphical debugging and remote access complying with 21 CFR Part 11 compliance.

    ? Reliable operation of equipment, and stable water quality.



Online message Top
Close
TitleOnsite installation

Online message

Close
Titlejoin us

join us